How a project actually runs
Every project starts with how you move through a space, not a mood board. Three stages, roughly in this order.
-
01 —
Survey & brief
Measured drawings of the existing space, and a working brief from an hour walking the site with you. Usually one to two weeks.
-
02 —
Design & model
Hand sketches first, then a 3D model you can walk through before anything is costed. Usually four to six weeks.
-
03 —
Detail & build
Full construction drawings, and we stay on as site contact through the build — timeline depends on the contractor's schedule.
Fees
How we charge
A fixed fee for survey and brief, agreed before we start. Design and detail stages are quoted as a percentage of construction cost once the brief is set, so you know the number before committing to it.